If you’re getting ready for an ALTA survey, the papers you gather before the surveyor shows up can make or break your closing date. Surveyors need certain title documents to do their job right. When those papers are missing or out of date, the survey can get delayed or need costly fixes later.
An ALTA survey checklist isn’t just about the fieldwork. It also covers what happens before that work begins. When you get the right title documents to your surveyor early, they can map the property correctly the first time. They can also catch problems before they turn into last minute headaches at closing.
Start With the Current Title Commitment
The title commitment is the base that the whole ALTA survey builds on. Without it, the surveyor is missing key facts about the property’s legal status.
This document shows what the title company found when it searched public records. It lists the legal description of the property, any liens or easements tied to the land, and any exceptions the title company plans to note on the final policy. The surveyor uses this information to know what to look for and confirm during the survey.
Order the title commitment as early as you can. If it’s more than a few months old by the time the survey happens, ask the title company if you need an updated copy. Property records can change in that gap. An old commitment might miss something that got recorded after it was issued.
Verify the Property Details in Schedule A
Schedule A lists the basic facts of the deal. This includes who owns the property now, the legal description, and the type of interest being insured.
Before you send Schedule A to the surveyor, check that the legal description matches the deed and any past survey on file. Small mistakes cause big problems. A wrong number in the description or a missing parcel from a multi-parcel purchase can lead to a survey that doesn’t match what the title company expects.
If you’re buying commercial property with several tax parcels or a recent line change, make sure Schedule A shows the property as it stands today. Surveyors build their fieldwork around this description. Any error here carries over into the final survey drawing.
Gather Documents Referenced in Schedule B
Schedule B lists the exceptions, easements, and other claims tied to the property. Many of these items point to other recorded documents that the surveyor needs to see in full, not just a short summary.
Here are some documents surveyors often need copies of:
- Recorded easements for utilities, access, or drainage
- Past surveys or plats mentioned in the legal description
- Deed restrictions or rules that affect the property lines
- Right of way grants or shared driveway agreements
- Recorded plans that show setbacks or building lines
Pulling these documents together takes time. Some may require a trip to the county register of deeds or a request through the title company. Start this step as soon as the title commitment comes back. That way the surveyor has everything before the site visit. Without full Schedule B documents, a surveyor may need to mark some items as unresolved. That can raise questions during underwriting.
Resolve Conflicting Legal Descriptions Early
Older properties often end up with more than one legal description. You might find different versions in the deed, past surveys, and tax records. When these don’t match, the survey process slows down while everyone tries to figure out which one is right.
If your property has gone through a subdivision, a lot line change, or a partial release over the years, pull every version of the legal description you can find. Compare them side by side. Look for differences in acreage, bearing calls, or the markers each one uses. Even a small gap can point to a recording mistake, an old boundary dispute, or land that was never properly transferred.
Bring any conflicts to your surveyor and title company before the fieldwork starts. Fixing a legal description mismatch usually takes teamwork between the surveyor, a title examiner, and sometimes an attorney. That kind of digging takes longer once the survey is already underway and a closing date is coming up fast.
Coordinate Revisions Before the Closing
Closings often move on a tight schedule, especially for commercial deals where a lender needs a final, certified ALTA survey before funding. Once the surveyor finishes the fieldwork and drafts the survey, there’s usually a review period. During this time, the title company, lender, and buyer’s attorney check the drawing against the title commitment.
This is when leftover questions need fast answers. Maybe Schedule B pointed to an easement the surveyor couldn’t find. Maybe the legal description still doesn’t match. Get these things sorted out before the survey goes into final review. Last minute revisions, especially ones that send the surveyor back to the property, can push back a closing date that everyone is counting on.
Keep the surveyor, title company, and any attorneys talking through this whole stage. A short phone call to check on open items often moves faster than a long email chain once the closing date gets close.
Frequently Asked Questions
Can an ALTA Survey Begin Without a Title Commitment?
A surveyor can start some early field work without a title commitment, but the survey can’t be finished to ALTA standards without one. The commitment shows the easements, exceptions, and other recorded items the surveyor must include on the final drawing. Most surveyors wait for at least a preliminary commitment before they finish the job.
Which Schedule B Documents Should the Surveyor Receive?
The surveyor should get copies of any document from Schedule B that affects the physical land. This includes easements, past surveys, right of way grants, and recorded plans showing setbacks or building lines. Documents that only touch on ownership or financing, with no physical location tied to them, usually matter less to the survey itself.
What Happens When Two Legal Descriptions Do Not Match?
When legal descriptions don’t match, the surveyor usually flags the issue and works with the title company or an attorney to find out which one is correct. Sometimes the mismatch points to a boundary problem that hasn’t been fixed yet. This kind of research can add time to the survey, so catching it early gives everyone more room to work it out before a closing deadline.