Redevelopment sites are messy. Old buildings sit next to buried pipes. Past owners left behind fences, walls, and easements nobody wrote down. Before a survey crew shows up, someone has to pick which ALTA Table A items go on the request.
That choice matters. It decides what the survey shows. It also decides how useful that survey will be once design work starts. In Detroit, redevelopment often means reusing an old building or working on land with a long history. Picking the right Table A items now can save a lot of trouble later.
Define What the Redevelopment Team Needs From the Survey
Start with the project, not the list of items.
Tearing down an old building calls for different survey work than keeping it and adding on. A site with known utility lines needs more detail than an empty lot.
Ask what the survey needs to do. Will an architect use it to place a new addition next to an old wall? Will an engineer use it to route stormwater? Will a lender need it to close the deal? Each answer points to certain Table A items. Skip this step, and you may end up with a survey that misses what your team actually needed.
Match ALTA Table A Items to Existing Site Conditions
Once you know what you need, compare that to what’s really on the ground.
Redevelopment land often shows signs of past use. A former factory site might still have old foundations or loading docks. These may not show up on any current plan. A property that has changed hands many times may have fences or walls that don’t match the recorded boundary.
This is where items like improvements, easement evidence, and parking deserve real thought. Don’t just check boxes out of habit. If the site shows signs of old construction, the survey should record those features. Skip an item, and the surveyor may miss something that matters later. An old utility vault sitting where a new building is planned is a good example.
Coordinate Utilities, Buildings, and Site Features Before Design
Utilities cause most of the surprises on a redevelopment site.
This is why Table A item 11 often belongs on the request. It covers utility location. Older properties often have utility lines from decades ago. These lines were never added to current city records. A redevelopment project needs to know where those lines actually run. This matters before design work sets a building footprint or parking layout.
Ask for utility location as part of the survey. Pair it with utility company markings. This gives your design team something solid to work from. It beats guessing based on old drawings.
The same goes for buildings that will stay in place. If part of a structure is staying, its exact spot matters. It affects setback rules and any planned addition. A clear survey helps you avoid conflicts once design work moves forward.
Separate ALTA Survey Detail From Engineering Design Needs
Not every piece of site information belongs on an ALTA survey. It helps to know the difference early.
ALTA/NSPS Land Title Surveys follow a set of standards. Table A items add to that scope in defined ways. Detailed grading, drainage design, and utility capacity work usually fall under civil engineering. This is true even when some of the same site data gets used.
Some teams try to pull every bit of design information from the ALTA survey alone. This often makes the survey cost more and read less clearly. It also doesn’t replace the engineering work still needed.
A better approach treats the ALTA survey as the foundation. It shows boundaries, existing conditions, and title matters. Engineering then builds on that foundation. Keep these two roles separate. Just make sure the survey still captures what engineering will need as a starting point.
Finalize Table A Selections With the Project Team Early
Table A choices work best as a group decision. Don’t leave it to one person’s checklist.
Surveyors, engineers, architects, and owners often care about different things. A surveyor can explain what each Table A item covers. An engineer or architect can point out which site details their work depends on. The owner usually knows the closing timeline and budget. Both affect how much detail makes sense.
Bring these people together before the survey request goes out. This helps you avoid a common problem. A missing Table A item often goes unnoticed until after fieldwork is done. Fixing that gap later costs more time and money than a short talk up front.